Campus Microgrid Project

Equipped with 200kW PV, 1000kW/1270kWh energy storage, 150kW gas generator, energy management level centralized monitoring platform, and load analysis

At a Glance

Installed Capacity:
200kW PV, 1000kW/1270kWh energy storage, 150kW gas generator
Location:
Brazil UNICAMP University
Solution:
Distributed Photovoltaic Solution
  • 6520d34caab4f.png
    Customer Requirements

    Ensure an uninterrupted electricity energy for the vital loads of public institutions

  • 6520d34caae63.png
    Solución a las necesidades

    PV 200kW Energy Storage 1000kW/1270kWh Gas Generator 150kW Energy management level centralized monitoring platform Load analysis

  • 6520d34cab086.png
    Benefit

    Lower electricity bills. Low investment, high return.

More Energy, Less Environmental Impact

The successful implementation of the first medium voltage microgrid project in Brazil will become a benchmark for microgrid projects in the Brazilian industry.

The project will apply the "Microgrid Project Execution Standards" discussed by the electric power research institute in early 2023 to actual execution process of the project. It is the first example of the on-site execution standards of China’s microgrid projects being applied in the world.